First new post in a while. Some very visible changes today. The siding on the front has started and the stone work was completed today.
[nggallery id=40 slideshow=caption template=caption]
First new post in a while. Some very visible changes today. The siding on the front has started and the stone work was completed today.
[nggallery id=40 slideshow=caption template=caption]
We haven’t posted anything in the last couple of days. That’s because the work going on now is pretty much all details (and hunting season started). We should see some big changes coming the first week of December. Stay tuned!
Here are a few photos to keep you up to date:
[nggallery id=39 slideshow=caption template=caption]
Trim work continues – gutters complete with leaf shields and snow guards went on today
[nggallery id=38 slideshow=caption template=caption]
Did you notice that all of the previous posts now appear on one page? Scroll down to see them.
The inspector was here for the electrical service today and flashing and trim was added in preparation for siding on the front wall.
[nggallery ID=37 slideshow=caption template=caption]
Moving on to finishing the exterior and starting the interior.
[nggallery id=36 slideshow=caption template=caption]
Concrete is finished and siding work continues:
Last concrete truck arriving:
[nggallery id=34 slideshow=caption template=caption]
Concrete was placed today! The first two bays were completed with two truckloads of 4000PSI concrete. One more tomorrow morning and the floor will be in place.
[nggallery id=30]
Something new today: a couple of short video clips. I’m still learning how to do this.
A lot of visible progress today!
[nggallery id=23]
[nggallery id=22]
Everything out of the building in preparation for concrete
[nggallery id=21]
A lot of progress this week. After backfilling and clearing out the excess excavated soil (rock) next week will see stone going down, then a vapor barrier, then concrete.
[nggallery id=20]
[nggallery id=18]
[nggallery id=19]
Here it is graded, seeded and covered with straw. Had a little rain.
Maybe the grass will grow.
Back to trenches and plumbing today
[nggallery id=17]
Progress is moving into high gear – it’s really starting to come together!
Lot’s of pictures today
[nggallery id=16]
You can start to see some of the features of the building – garage door openings, windows and the porch at the office.
(In case you don’t know what the layout looks like, you can see it here.)
[nggallery id=15]